Home > Products > Upward Continuous Casting Machine > 45KW Electric Furnace Continuous Casting Machine Upward Type For Oxygen Free Copper Rod
45KW Electric Furnace Continuous Casting Machine Upward Type For Oxygen Free Copper Rod
- 0 Square Meter / Square Meters per Month
- T/T L/C D/P D/A
- 7 days
- GYPEX yingpeng BKFR-3.5FG-pit wall mounted air conditioning · Direct sales from Yingpeng manufacturer · Affordable price · Quality assurance
- GYPEX Yingpeng BFKT-5.0FG Two Horses of Power Performance Pullman · Wall Mounted Air Conditioning
- GYPEX yingpeng BFKG-12FT ZHONGSHANCeiling mounted air conditioning fan with intelligent adjustment for rapid cooling GYPEX
- GYPEX BFKG-7.5FL Vertical cabinet type, installation free, intelligent temperature control adjustment, air conditioning manufacturer direct sales
- Heating Ventilation Conditioning
- yingpeng BKFR-3.5FG-pit wall mounted air conditioning · Direct sales from Yingpeng manufacturer · Affordable price · Quality assurance
Product Details
Brand Name: | Jingjie | Place of Origin: | China | Model Number: | GVT |
Product Description
45KW Electric Furnace Continuous Casting Machine Upward Type For Oxygen Free Copper Rod
AN OXYGEN FREE COPPER ROD Φ8mm CONTINUOUS CASTING PRODUCTION LINE
COMPOSITION OF EQUIPMENT
Single furnace, continuous casting machine, guild wheel frame, wire frame, double bar coiling machine, water cooling system, temperature measurement system and control system.
MAIN TECHNICAL PARAMETERS OF THE EQUIPMENT
1, there is a core frequency induction furnace
(1) production of T2 copper rod (raw material electrolytic copper, bright wire)
(2) furnace body structure
(3) electric furnace power 45KW
(4) electric furnace voltage 380V
(5) the frequency of electric furnace 50HZ
(6) the melting rate of less than 150kg
(7) electric furnace capacity 500kg
2, continuous casting machine
(1) the number of cast rod 2
(2) cast rod diameter specification 8mm; head number 2
(3) drive AC servo drive
(4) servo motor power 1.3KW
(5) the tracking accuracy of the liquid level is + 2mm
3, double bar coiling machine
(1) automatic take-up rod
(2) to close the line into a circle around the weight of 300kg
PRODUCT TECHNICAL STANDARDS
1, density: 8.9kg/dm fand
DELIVERY OF TECHNICAL DOCUMENTS AND DRAWINGS
1.The Seller shall provide the following documents and drawings within 15 days after the contract is signed and effective.
a. Equipment layout plan
b. The basic condition of equipment and civil engineering
c. Water and electricity layout
d. The operation platform.
2. The Seller shall provide the following documents and drawings when the equipment is delivered.
a. Process document and operation specification of continuous casting machine
b. The general equipment and consumables drawings.
c. Detail table of equipment wearing parts
d. The electrical principle diagram and system diagram.
e. The installation of electrical cable material list.
SELLER'S SCOPE OF RESPONSIBILITY
1. The Seller shall be responsible for the installation and commissioning of the contract equipment and the delivery of the relevant provisions of the annex.
2, according to the contract requirements to submit the relevant technical documents.
3. Responsible for the installation, commissioning and training of contract equipment.
4, equipped with special tools for the use of the installation.
5, technical services: customer service guaranteed for one year, life-long maintenance (except coil, water jacket, melting ditch).
6, follow-up technical support: equipment upgrades and assist to build the furnace, etc..
7, service response time: the buyer informed within 48 hours.
8, responsible for equipment acceptance and timely handling of the relevant transfer procedures.
BUYER'S SCOPE OF RESPONSIBILITY
1, production workshop: span, length, height of crane lifting equipment installation, all shall comply with the requirements.
2, circulating cooling water.
3, power supply.
4, compressed air.
5, test for production of raw materials and auxiliary (charcoal, graphite flake etc.)
6, the seller is responsible for the provision of equipment in the installation process of staff and board.
MAIN EQUIPMENT CONFIGURATION AND SUPPLY RANGE